Industrial Wastewater Treatment Success Stories

Successfully Treating Winery Wastewater

Save $135k Treating Winery Wastewater

Many smaller wineries have outgrown their septic tanks, and larger wineries have outgrown their treatment ponds, a BioReactor gives increased capacity at a fraction of the cost of conventional pond treatment systems.

Winery Wastewater Jar TestWineries traditionally treat their wine process wastewater with aerobic (aerated) ponds to biologically degrade the biochemical oxygen demand (BOD). The treated wastewater from these ponds needs to have a BOD of 40 ppm or less (depending on the location of the winery) before the winery can discharge the water to the vineyards for irrigation.

Winery ponds require a large surface area (detention time) to treat the winery wastewater usually between 60-90 days for conservative design. Since the ponds have a large surface area, they need to include the capacity to hold a prolonged rain based on a 10-year rainfall event.

An Alternative Solution

Instead of ponds, there is another way to degrade the BOD down to the levels required for irrigation discharge. The solution is the use of a biological returned activated sludge system also called a BioReactor. A BioReactor is a more efficient biological process than a pond system.

Winery Bioreactor eliminates PondsThe BOD degradation in a BioReactor process involves a series of tanks either in ground (concrete) or above ground (steel or polyethylene). The oxygen is supplied with blowers and a fixed grid aeration system.

The EQ-Blower provides pre-aeration as well as mixing to the equalization tanks with coarse bubble diffusers. The second equalization tank is for further aeration and mixing as well as the reseeding of the activated sludge from the final clarifiers.

After a detention time of 24-36 hours, the wastewater flows into the clarifier for settling of the solids forming sludge (sludge settling).

The sludge is important since it has a high concentration of the biomass (bacteria) that needs to be returned to the aeration process, hence the name 'returned activated sludge'. Either system will still require an irrigation pond, but there is a significant amount of money that can be saved with a BioReactor system.

The pond system for the facility would have a comparative summary of the expenses of installing a pond treatment system, either clay or plastic lined ponds, the loss in vineyard grape production and other expenditures not usually accounted for by winery owners estimated at $363,900, while the BioReactor system resulted in a cost of $228,210, thus a savings of $135,690 or 37%.

The traditional pond systems to treat winery wastewater requires a good deal of acreage due to the long detention times required for the degradation of BOD to the levels required for irrigation. A BioReactor can save a significant amount of capital costs, increase the wineries wastewater capacity at a fraction of the costs of conventional pond treatment methods. Existing wineries can easily adapt the BioReactor system into their process and new wineries can greatly benefit by utilizing these advantages from the start.

$Start Saving$

Get Your Evaluation...

To download more case studies click here...

Call 1-877-965-1577
Toll Free

Wastewater Treatment Success Stories Home

Integrated Engineers Inc Logo

Featured Case Studies

Case Studies By Industry

More Featured Case Studies

Better Business Bureau Accreditation

Call 1-877-965-1577 Toll Free

Integrated Engineers Incorporated
40308 Greenwood Way
Oakhurst, CA 93644 USA
Country Code +1
(877) 965-1577 toll free
(559) 683-8284 phone
(559) 683-8913 fax

Email us:

sales@wecleanwater.com

Check Out Our Industrial Wastewater Treatment Environmental Expert Profile

*© 2011 Copyright Integrated Engineers , Inc., all Floccin™ products and equipment designed by Integrated Engineers, Inc., disclosed herein on this website are the exclusive properties of Integrated Engineers, Inc. and shall not be copied or reproduced in whole or in part without the express written consent of Integrated Engineers, Inc.... Click Here to Read about How Integrated has saved industry millions...You may find savings too! Find out now...

Call 1-877-965-1577

 

Bookmark and Share