Industrial Wastewater Treatment Success Stories
Successfully Treating Large Amounts of Winery Wastewater
Large Wineries - Odors Eliminated
Case Study #1
The local RWQCB and the town of Madera required this facility to decrease the effluent BOD levels to reduce the odors coming from their spray fields.
Integrated Engineers, Inc was selected to assist the engineering staff in determining the extent of BOD removal from the many wine making operations.
It was determined that isolation of the wine filtering would remove the majority of the pounds of BOD generated in the wastewater. Sumps were installed to capture this high strength wastewater and Integrated Engineers, Inc. provided a turnkey BioReactor to treat the 50,000 gpd wastewater with an average BOD of 15,000 ppm. Result: No more odors in their spray fields.

Case Study #2
The RWQCB submitted several notices of violation for excessive odor levels beyond the facilities spray field boundaries.
The staff selection process chose Integrated Engineers, Inc as the vendor to provide engineering design and construction management of the BioReactor system capable of treating 350,000 gpd of winery wastewater. Due to the limited space and quantity of wastewater, Integrated Engineers, Inc. designed a tandem blower system capable of aerating at a depth of 36 feet. Therefore, the facility was able to use taller tanks and reduce the foot print. Result:: No more odors.
To download more case studies click here>>>