Oil Industry Industrial Wastewater Treatment

Oil Field Wastewater Dewatering Company Case Study

An oil field contract dewatering company was unable to dewater the oily water solids from several oil field storage tanks using conventional coagulants and flocculants.

The swings in solids loading and oil content made it very difficult to control the correct dosage rate as conventional chemistry has a very tight tolerance to maintain a dewaterable floc. The result was an ongoing blinding problem for the mobile belt press.

Oil

After 3 months of effort and only 15,000 gallons dewatered, Integrated Engineers, Inc was contacted and asked to solve the problem. Using Floccin™ HP, the problem was easily solved. The rest of the 50,000 gallons was dewatered in 8 hours with only 500 lbs of Floccin™ HP (dewatered solids pictured above).

Oil

This picture shows the filtrate, the settled floc, and the floc prepress.

 

To download more case studies click here>>>

Or get started right away>>>Get Started

Call 1-877-965-1577 Toll Free

Wastewater Treatment Success Stories Home

Integrated Engineers Inc Logo

Featured Case Studies

Case Studies By Industry

More Featured Case Studies


Copyright 1994 - 2010 Integrated Engineers Inc

Integrated Engineers Incorporated
40308 Greenwood Way
Oakhurst, CA 93644 USA
Country Code +1
(877) 965-1577 toll free
(559) 683-8284 phone
(559) 683-8913 fax

Email us:

sales@wecleanwater.com
techsupport@wecleanwater.com

Better Business Bureau Accreditation

Bookmark and Share