Oil Industry Industrial Wastewater Treatment

Oil Field Wastewater Dewatering Company Case Study

An oil field contract dewatering company was unable to dewater the oily water solids from several oil field storage tanks using conventional coagulants and flocculants.

The swings in solids loading and oil content made it very difficult to control the correct dosage rate as conventional chemistry has a very tight tolerance to maintain a dewaterable floc. The result was an ongoing blinding problem for the mobile belt press.

Oil

After 3 months of effort and only 15,000 gallons dewatered, Integrated Engineers, Inc was contacted and asked to solve the problem. Using Floccin™ HP, the problem was easily solved. The rest of the 50,000 gallons was dewatered in 8 hours with only 500 lbs of Floccin™ HP (dewatered solids pictured above).

Oil

This picture shows the filtrate, the settled floc, and the floc prepress.

 

To download more case studies click here>>>

Or get started right away>>>Get Started

Call 1-877-965-1577
Toll Free

Wastewater Treatment Success Stories Home

Integrated Engineers Inc Logo

Featured Case Studies

Case Studies By Industry

More Featured Case Studies

Better Business Bureau Accreditation

Call 1-877-965-1577 Toll Free

Integrated Engineers Incorporated
40308 Greenwood Way
Oakhurst, CA 93644 USA
Country Code +1
(877) 965-1577 toll free
(559) 683-8284 phone
(559) 683-8913 fax

Email us:

sales@wecleanwater.com

Check Out Our Industrial Wastewater Treatment Environmental Expert Profile

*© 2011 Copyright Integrated Engineers , Inc., all Floccin™ products and equipment designed by Integrated Engineers, Inc., disclosed herein on this website are the exclusive properties of Integrated Engineers, Inc. and shall not be copied or reproduced in whole or in part without the express written consent of Integrated Engineers, Inc.... Click Here to Read about How Integrated has saved industry millions...You may find savings too! Find out now...

Call 1-877-965-1577

 

Bookmark and Share