Mining Wastewater Treatment Highlights
Save Big in Mining Wastewater Treatment with Floccin™ & Wastewater Optimzation & Analysis
Mining Wastewater Can Benefit from Integrated Wastewater Optimization with Floccin™
Leadville Mine Drainage Tunnel 2010
Mobile Dewatering Unit
Integrated Engineers, Inc. responded to the request for a proposal to be submitted, that included, but was not limited to, the following specifications:
- Mobile dewatering unit capable of achieving a 35-45% solids metal hydroxide sludge; with 4.0 cubic yard cake capacity per load, able to operate under cold weather conditions.
- Engineer on site at time of commissioning to assist with start-up and training.
The trailer mounted filter press was delivered to the Leadville Mine Drainage Tunnel March 2010. Integrated Engineers, Inc.’s professional engineer assisted with the commissioning of the project successfully and the unit continues to operate in Leadville, CO.
Click Here to read the Full Leadville Mine Drainage Tunnel Case Study...
Click Here For More Info From the Bureau of Reclamation...
Mining Metals Wastewater Treatability Jar Testing
Integrated Engineers, Inc. conducted a treatability test on water containing metals in solution from a mining company’s analysis labs.
Initial pH was below 2, so it was adjusted to 6.5 to 7.5 using caustic. This lowers the solubility of the metals, and helps the Floccin™ wastewater Flocculating Agents to work better.
Click Here to read the Full Mining Metals Wastewater Treatment Case Study...
Click Here To Download More Case Studies...
Click Here to Get Started Right Away...