Manufacturing Wastewater Treatment Case Studies

Industrial Machinery Wastewater Treatment Ability Test

The sample was received with a pH of approximately 10 and was pH adjusted downward with caustic fluid. 100 ml of the sample was tested and dosed with .25 grams of Floccin™ J and provided the results as shown below; which equates to a dosage rate of 21 lbs. per 1000 gallons of wastewater.

Reaction time was 3-4 minutes with a settling time of 90-120 seconds. Suspended solids content of the untreated water is 500ppm and after treatment was less than 30ppm.

Floccin J Machinery Wastewater Treatment Samples Before and After Treatment with Flocculating Agent
 

Follow the links at the left for more industrial wastewater treatment manufacturing case studies.

Download more manufacturing industry case studies here>>>

Get Started Right Away>>>Get Started

Call 1-877-965-1577
Toll Free

Wastewater Treatment Success Stories Home

Integrated Engineers Inc Logo

Featured Case Studies

Case Studies By Industry

More Featured Case Studies

Better Business Bureau Accreditation

Call 1-877-965-1577 Toll Free

Integrated Engineers Incorporated
40308 Greenwood Way
Oakhurst, CA 93644 USA
Country Code +1
(877) 965-1577 toll free
(559) 683-8284 phone
(559) 683-8913 fax

Email us:

sales@wecleanwater.com

Check Out Our Industrial Wastewater Treatment Environmental Expert Profile

*© 2011 Copyright Integrated Engineers , Inc., all Floccin™ products and equipment designed by Integrated Engineers, Inc., disclosed herein on this website are the exclusive properties of Integrated Engineers, Inc. and shall not be copied or reproduced in whole or in part without the express written consent of Integrated Engineers, Inc.... Click Here to Read about How Integrated has saved industry millions...You may find savings too! Find out now...

Call 1-877-965-1577

 

Bookmark and Share