Industrial Wastewater Treatment Success Stories

Class A Industrial Wastewater Treatment Plant

Settling Time Reduced From Twelve Hours to 30 minutes!

This facility receives and treats oily wastewater from industrial clients. The water is treated with an initial oil/water separator, collected in a reaction tank where Floccin-J is used at a dosage of 325 lbs/18,000 gallons, then dewatered using a filter press. The results of the preliminary tests with just Floccin-J are shown below:

General Analysis (units in mg/L)

  Untreated Treated %Removal
BOD 14,100 5,190 63.2%
TDS 3,600 3,650 Negligible

Class A Industrial Wastewater Treatment Facility

 

 

 

Total Toxic Organics, EPA Method 8260B (all units in ppb)

  Untreated Treated %Removal
1,4-Dichlorobenzene 181 ND >99%
Ethyl benzene 168 ND >99%
Toluene 3,530 19 99.5%

Total Threshold Limit Concentration, TTLC (all units in ppm)

  Untreated Treated %Removal
Antimony ND ND N/A
Arsenic .032 ND >99%
Barium 5.64 ND >99%
Beryllium ND ND N/A
Cadmium .141 ND >99%
Chromium, Total 2.65 .025 99%
Cobalt .169 .036 79%
Copper 10.2 .047 99.5%
Lead 4.51 .015 99.7%
Mercury ND ND N/A
Molybdenum 4.79 1.41 70.6%
Nickel 3.05 .436 85.7%
Selenium ND ND N/A
Silver .039 ND >99%
Thallium ND ND N/A
Vanadium .167 ND >99%
Zinc 74.1 .645 99.1%

 

Class A Industrial Wastewater Treatment Facility Jar TestThe picture of the treated and untreated water shows a drastic improvement over the previous coagulant/flocculant chemistry. The value of the Floccin-J is the increased throughput in the facilities operation. Their previous process required a 12hour settling time to be able to start the decanting process. They now can start decanting in 30 minutes. Integrated Engineers, Inc is providing assistance in helping with adding equipment and processes to reuse part of the treated wastewater and meet stringent discharge limitations as a disposal option.

To download more case studies click here>>>

Get Started

Call 1-877-965-1577
Toll Free

Wastewater Treatment Success Stories Home

Integrated Engineers Inc Logo

Featured Case Studies

Case Studies By Industry

More Featured Case Studies

Better Business Bureau Accreditation

Call 1-877-965-1577 Toll Free

Integrated Engineers Incorporated
40308 Greenwood Way
Oakhurst, CA 93644 USA
Country Code +1
(877) 965-1577 toll free
(559) 683-8284 phone
(559) 683-8913 fax

Email us:

sales@wecleanwater.com

Check Out Our Industrial Wastewater Treatment Environmental Expert Profile

*© 2011 Copyright Integrated Engineers , Inc., all Floccin™ products and equipment designed by Integrated Engineers, Inc., disclosed herein on this website are the exclusive properties of Integrated Engineers, Inc. and shall not be copied or reproduced in whole or in part without the express written consent of Integrated Engineers, Inc.... Click Here to Read about How Integrated has saved industry millions...You may find savings too! Find out now...

Call 1-877-965-1577

 

Bookmark and Share